Project Client Seedhawk Manufacturing Inc.
Project Cost $6,000,000
Lead Engineer Sean Kilback
Building Size 45000 sq. ft.
Year Completed 2011

Manufacturing plant constructed using cast in place concrete foundations and structural steel superstructure.  This facility included several cranes ranging from 1 ton jib cranes to 7.5 ton overhead. Wide and large overhead door with openings up to 32' in width.